This Page

has been moved to new address

Long Arm Quilting Checklist

Sorry for inconvenience...

Redirection provided by Blogger to WordPress Migration Service
LoveBug Studios Blog: Long Arm Quilting Checklist

LoveBug Studios Blog

Happenings at the quilting studio!

Saturday, January 15, 2011

Long Arm Quilting Checklist

You know, I was loading up a new quilt on Mr. Darcy to work on today, and it started to occur to me exactly how much has to be done before I can put a stitch of thread into the quilt.

  1. Pick the thread
  2. Wind a bobbin or four (one day I will be able to accurately predict how many I need!)
  3. Wipe down the machine (it gets dusty)
  4. Wipe down the tracks (a clean track means no bobbles from the machine running over something)
  5. Clean the wheels (you wouldn't believe how much GUNK gets on them - from where?!?)
  6. Thread the machine
  7. Change the needle (after every project, sometimes there's a needle change mid-project too)
  8. Clean the bobbin race
  9. Oil the bobbin
  10. Check the bobbin tension & adjust
  11. Plug in the machine (yup it's on a surge protector; yup, I'm still paranoid)
  12. Turn it on
  13. Reset the trip counter (yes, I'm OCD like that - Jen's quilt used 241,178 stitches and 720 yds of thread!)
  14. Load the backing
  15. Load the batting
  16. Load the quilt top
  17. Fasten the rails
  18. Set the side tensioners
  19. Check & adjust the tension (rinse & repeat I don't know how many times)
  20. Baste a horizontal line through backing & batting to align the quilt top
  21. Pin the quilt top
  22. Baste the top edge of the quilt
  23. Baste the sides
That's just to get to the point where I can start freehand quilting; if I'm doing a pantograph (as with this quilt), there are several more steps to do!

I guess I should hop back to it!

To endless possibilities,

Ebony

Labels: ,